September 20, 2002 -
Sullivan Indiana.
Photo courtesy of
Larry E. Gilbert.

Wig-Wag, LLC
N-Scale for the Discriminating Modeler!

No E-Bay Auctions
at this time
Refer a Friend
Please

AMD4 Install Before & After Pictures for SD9 
If you are looking for something specific, not shown below, please
use the
Google Search Link
here
,
or the Google search at the bottom of all pages on our site:


If you are unable to find an item on our site after using the Google search,
e-mail us
and let us know what item you could not locate.
Stock Items!
As much as possible and within the limits of demand and responsible fiscal management we keep these in stock
TCS Atlas AMD4 Decoder for SD9

The following pictures are BEFORE and AFTER shots of the SD9 Locomotive with the AMD4 Decoder.
For Detailed Installation Instructions please click here.
Click on ANY photo to enlarge it.

Gently remove the 4 handrail ends from the cab by easing them out of their holes, gently pull the body off the frame by gripping it and the bogies, the body may come apart from the walkway when pulling apart, pull the fuel tank from the frame.

Mark the bogies and frame halves and note their orientation, remove the 2 screws securing the frame halves and gently prise the frame halves apart on the top just enough to release the original circuit board. Remove the led shrouds from the original board and fit to the AMD4 board. Test fit the AMD4 board into the frame lugs, they should be an interference fit and not to tight or loose. If it is too tight there are 2 options,

1- VERY GENTLY prise the lug apart, if using this method it is safer to repeat the operation several times rather than overdoing it the first time as there is a risk of snapping off the lugs

2 - Completely strip the frames and move the motor and gearing well away from the work area and using a needle file widen the gap, ensure the frame halves are clean before refitting the motor. If it is too slack, build up a little solder on the offending pads.

When the board will fit snugly into the lugs place a piece of Kapton tape on the frame where the motor tabs pass through the frame just below where the board will fit and rebuild all the parts in reverse order of strip down, when securing the frame halves with the screws do not over tighten them as they will cause the bogies to bind. Using a multimeter, test across the frames to check that they are no shorts.

Test the locomotive for operation and adjust any CV’s as required, refit the body and enjoy.

 

For Detailed Instructions on Installation Click Here!

 

Last Update: Wednesday, March 3, 2010 2:27 PM , By JF

       
 .    
Badger
Bev-Bel
     
Cal Freight
.
 
CTT
 
 
Excel
Hobby
Tools
Floquil
Herpa
 
J-n-J
   
Kibri
   
 
     
Mini-Figs
Model
Rail
Stuff
 
 
   
   
   Stewart Products    
Tichy
Train
Group
   
Unreal Details
.
Not all of the items on this page may still be in stock or available
but the information is provided for reference purposes.
(We reserve the right to correct errors and change prices without prior notice.)
Google
WWW www.wig-wag-trains.com